Telecom / Fibre (OSP) Engineer
Designs and builds the outside plant of telecom networks: duct routes, manholes, fibre cables, splicing and testing, for operators, cities, roads and large developments.
Career path
- 1Junior OSP engineerRoute surveys, as-builts, splice records
- 2OSP design engineerDuct and fibre design, permits, bills of quantities
- 3Senior OSP / network engineerLarge networks, contractor management, acceptance testing
- 4Network infrastructure managerProgrammes, operator approvals and budgets
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Certified Fiber Optic Technician (CFOT) | Fiber Optic Association (FOA) | Early career |
| Outside Plant Designer (OSPD) | BICSI | Mid-career |
| Registered Communications Distribution Designer (RCDD) | BICSI | Senior |
| PMP – Project Management Professional | PMI | Senior |
Interview questions
How do you calculate a fibre loss budget?
Add the fibre attenuation (length × dB/km at the wavelength), the loss of each connector pair and each splice, and a margin for repairs, then compare it with the equipment's power budget.
What does an OTDR trace show?
Distance along the fibre against reflected light: it shows the fibre's attenuation, the position and loss of splices and connectors, bends, and the end or break of the fibre, from one end of the cable.
What do you check before accepting a duct route?
Correct depth and cover, separation from other utilities, mandrel or rodding test for each duct, sealed duct ends, manhole construction and numbering, and as-built survey coordinates.