Project controls & management

Technical Office Engineer

Runs the document side of a project: material and shop drawing submittals, RFIs, as-builts, variation support and correspondence with the consultant.

Career path

  1. 1
    Technical office engineerSubmittals, RFI log, drawing control
  2. 2
    Senior technical office engineerVariations, claims support, design coordination
  3. 3
    Technical office managerAll disciplines' documentation and contract correspondence
  4. 4
    Contracts / project managerCommercial and contractual leadership

Core skills

Document control (Aconex)Shop drawing reviewSpecificationsFIDICReport writing

Recommended certificates

CertificateIssued byWhen
Autodesk Certified Professional: AutoCADAutodeskEarly career
CAPM – Certified Associate in Project ManagementPMIEarly career
FIDIC Certified Contract ManagerFIDICMid-career
PMP – Project Management ProfessionalPMIMid-career
Career tipContract knowledge is what separates a technical office manager from a document controller. Study FIDIC Clause 20 (claims) and Clause 13 (variations).

Interview questions

What is the difference between Code B and Code C?

Code B is approved as noted: work can proceed while comments are incorporated. Code C means revise and resubmit, so work must not proceed.

How do you track submittals on a large project?

With a submittal log showing every item, revision, dates and status, linked to the procurement schedule so late approvals are flagged before they delay orders.

When would you raise a variation?

When an instruction changes the scope, quantity, quality or sequence of the contract works. I notify within the contract time limits and keep supporting records.

Check each certifying body's website for current eligibility and exam requirements.