Sustainability & Energy Engineer
Guides projects through green building ratings, energy modelling and efficiency measures, and reports on carbon and resource performance.
Career path
- 1Sustainability engineerRating documentation, credit tracking
- 2Senior sustainability consultantEnergy modelling, design advice
- 3Sustainability / energy managerCorporate strategy, portfolio performance
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| LEED Green Associate | USGBC / GBCI | Early career |
| GSAS Certified Green Professional (GSAS-CGP) | GORD (Qatar) | Early career |
| LEED AP BD+C | USGBC / GBCI | Mid-career |
| Certified Energy Manager (CEM) | AEE | Mid-career |
| Certified Measurement & Verification Professional (CMVP) | AEE / EVO | Senior |
Interview questions
What is the difference between GSAS and LEED?
Both rate building sustainability. GSAS was developed for the region's climate by GORD in Qatar. LEED is the US Green Building Council's global system.
How do you reduce cooling energy in a hot climate?
Better façade performance and shading, efficient chillers and controls, heat recovery on fresh air, and right-sized systems.
What is measurement and verification?
A method to prove energy savings by comparing measured consumption against an adjusted baseline, using an approach such as IPMVP.
Check each certifying body's website for current eligibility and exam requirements.