Design & engineering

Structural Design Engineer

Analyses and designs buildings and infrastructure in concrete and steel: loads, models, member design, connections and drawings, then answers site queries and checks shop drawings.

Career path

  1. 1
    Graduate structural engineerLoad take-down, member checks, drawing mark-ups
  2. 2
    Structural engineerBuilding models, design calculations, coordination
  3. 3
    Senior structural engineerComplex structures, checking others' work, authority approvals
  4. 4
    Associate / chartered leadDesign sign-off, client relationship, team leadership

Core skills

ETABS / SAP2000 / SAFETekla / Revit StructureEurocode 2 & 3 or ACI 318 / AISC 360Seismic and wind loadingFoundation design with geotechnical inputHand checks of computer output

Recommended certificates

CertificateIssued byWhen
Autodesk Certified Professional: Revit for Structural DesignAutodeskEarly career
Local engineer registration (Qatar, Saudi Arabia, Egypt)National authorityEarly career
Chartered Structural Engineer (MIStructE)Institution of Structural EngineersSenior
Professional Engineer (PE) Civil: Structural / SE licenceNCEES (US)Senior
Career tipNever sign off a model you cannot check by hand. A quick load take-down and a simple beam check catch most modelling mistakes.

Interview questions

How do you check a computer model is reasonable?

Compare total vertical reactions with a hand load take-down, check a typical beam and column by hand, look at the deflected shape and mode shapes for oddities, and confirm units, supports and load combinations.

What causes most cracking in Gulf concrete structures?

Plastic and drying shrinkage from fast evaporation in heat and wind, thermal cracking in thick pours, and later corrosion of reinforcement from chlorides. Curing, mix design, cover and joint layout are the main defences.

What do you check on a rebar shop drawing?

Bar sizes and spacing against the design, laps and anchorage lengths, cover, bends and hooks, congestion at joints, and that openings and embedded items are trimmed as designed.

Check each certifying body's website for current eligibility and exam requirements.