Sustainability & energy

Solar PV / Renewable Energy Engineer

Designs, builds and commissions solar PV systems, from rooftops to utility plants, and increasingly battery storage, including yield studies, electrical design and grid connection.

Career path

  1. 1
    Graduate / junior PV engineerLayouts, string sizing, yield simulations
  2. 2
    PV design engineerElectrical design, cable and inverter sizing, grid connection documents
  3. 3
    Senior engineer / site managerConstruction, testing and commissioning to IEC 62446
  4. 4
    Project / engineering managerUtility-scale delivery, EPC contracts, performance guarantees

Core skills

PVsyst / SAM yield studiesString and inverter sizingIEC 62446 testingGrid connection codesBattery energy storage basicsAutoCAD / PV layout tools

Recommended certificates

CertificateIssued byWhen
NABCEP PV AssociateNABCEP (US)Early career
NABCEP PV Installation ProfessionalNABCEP (US)Mid-career
Certified Energy Manager (CEM)Association of Energy Engineers (AEE)Mid-career
PMP – Project Management ProfessionalPMISenior
Career tipLearn to read a PVsyst report critically: losses, soiling and temperature assumptions are where most yield disputes start, especially in dusty Gulf conditions.

Interview questions

Why does temperature matter for PV design in the Gulf?

Module voltage and power fall as cell temperature rises, so hot summers cut output, while cold mornings raise open-circuit voltage. Strings are sized so the maximum voltage stays within the inverter limit at the lowest temperature, and yield uses realistic hot-weather losses.

What tests do you run before energising a PV system?

Following IEC 62446-1: continuity of protective conductors, polarity, string open-circuit voltage and short-circuit current against expected values, insulation resistance of the DC side, and functional tests of the inverters and protection.

What is soiling loss and how do you manage it?

The output lost to dust on the modules. In the Gulf it can be significant, so it is included in the yield study and managed with a cleaning schedule (dry or water), module tilt and monitoring to spot strings that drop.

Check each certifying body's website for current eligibility and exam requirements.