QA/QC Engineer
Makes sure work meets the specification: prepares quality plans and ITPs, manages inspections and NCRs, and audits the quality system.
Career path
- 1QC inspector / engineerInspections, test witnessing, NCRs
- 2QA/QC engineerITPs, method statements, audits
- 3QA/QC managerProject quality management system and client audits
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Lean Six Sigma Green Belt | Various (e.g. ASQ, IASSC) | Early career |
| ISO 9001 Lead Auditor | CQI & IRCA | Mid-career |
| Certified Quality Engineer (CQE) | ASQ | Mid-career |
| Certified Manager of Quality/Org. Excellence (CMQ/OE) | ASQ | Senior |
Interview questions
What goes into an inspection and test plan?
Each activity, the acceptance criteria and reference standard, the inspection frequency, the records produced and the hold and witness points for each party.
How do you close an NCR?
Agree the root cause and corrective action, verify that the fix was done and is effective, then get the consultant's sign-off on the closure.
How do you prepare for an external audit?
Run an internal audit against the same standard first, close the findings, and make sure records are complete and easy to retrieve.
Check each certifying body's website for current eligibility and exam requirements.