Design & engineering

Process & Piping Engineer

Designs, builds and hands over process plant: P&IDs, piping classes and layouts, pressure relief, testing and mechanical completion. In the Gulf, the work is mostly oil and gas, petrochemicals, LNG, power and desalination.

Career path

  1. 1
    Graduate / site piping engineerTest packs, isometric checks, punch lists
  2. 2
    Piping or process engineerLine sizing, piping classes, relief studies, P&ID updates
  3. 3
    Lead engineerDiscipline lead on a project, interface with the client and vendors
  4. 4
    Engineering manager / technical authorityCompany standards, approvals, HAZOP chair

Core skills

Reading P&IDs and isometricsASME B31.3 and piping classesRelief valve sizing (API 520 / 521)Pressure testing and test packsHAZOP participationHazardous area basics (IEC 60079)3D model reviews (E3D, Smart 3D)

Recommended certificates

CertificateIssued byWhen
Local engineer registration (Qatar, Saudi Arabia, Egypt)National authorityEarly career
Client approval as discipline engineer (e.g. Saudi Aramco, QatarEnergy)ClientEarly career
API 570 Piping InspectorAPIMid-career
CompEx (Ex installation and inspection)CompEx / JTLMid-career
Chartered Engineer (CEng)IChemE / IMechESenior
Career tipGo to the HAZOPs, even as a junior. You learn more about how the plant really works in one week of HAZOP than in a month of drawings.

Interview questions

How do you check the wall thickness of a process line?

Use B31.3: t = P D ÷ 2(S E W + P Y), add the corrosion allowance, then allow for the mill tolerance and pick the next schedule. Take S and E from the code tables for the material and design temperature, and check that the piping class already covers it.

What do you check before a hydrotest?

That the test pack is complete and approved, welds and NDT are accepted, supports are in, items that can't take the pressure are removed or isolated, blinds are logged, gauges are calibrated, there is a relief valve on the manifold and the exclusion zone and permit are in place.

What sizes a relief valve?

The governing scenario from the API 521 study (blocked outlet, fire, control-valve failure and others) gives the relieving rate. API 520 then gives the required area, and the next API 526 orifice is chosen. Inlet loss and back pressure are checked last.

Check each certifying body's website for current eligibility and exam requirements.