Design & engineering

Lighting Designer

Designs lighting that meets standards and looks right: offices, facades, roads, sports and landscapes, balancing illuminance, glare, energy and controls.

Career path

  1. 1
    Junior lighting designerCalculations, luminaire schedules, renderings
  2. 2
    Lighting designerFull design packages and coordination with architects
  3. 3
    Senior lighting designerConcept design, mock-ups, client presentations
  4. 4
    Associate / design directorStudio leadership and signature projects

Core skills

DIALux evo / Relux / AGi32EN 12464-1 & road lighting (EN 13201)Glare (UGR) and uniformityLighting controls (DALI)Photometric data (LDT/IES)Energy codes

Recommended certificates

CertificateIssued byWhen
Lighting Certified (LC)NCQLP (US)Early career
Society of Light and Lighting membershipSLL (CIBSE)Early career
LEED Green AssociateUSGBC / GBCIMid-career
Professional membershipInternational Association of Lighting Designers (IALD)Senior
Career tipBuild a portfolio with before/after photos and the calculation behind each project. Clients buy the result they can see; engineers trust the numbers behind it.

Interview questions

What is UGR and why does it matter?

The Unified Glare Rating describes discomfort glare from luminaires seen in the field of view. Standards such as EN 12464-1 set maximum UGR values by task (for example 19 for offices), so luminaire choice and layout must keep glare below that limit.

How do you choose a maintenance factor?

From the lamp lumen depreciation, luminaire dirt depreciation, room surface depreciation and lamp survival for the cleaning cycle and environment. Dusty Gulf sites need a lower factor or more frequent cleaning.

What does DALI add to a lighting design?

Individually addressable dimming and control of each luminaire or group, scenes, daylight and occupancy control, and fault feedback, which saves energy and allows changes without rewiring.

Check each certifying body's website for current eligibility and exam requirements.