Lift & Escalator Engineer
Plans and delivers lifts and escalators: traffic analysis and selection in design, then installation, testing, inspection and maintenance contracts so people move safely and on time.
Career path
- 1Lift technician / junior engineerInstallation support, maintenance visits
- 2Lift engineerInstallation supervision, testing and handover
- 3Vertical transportation consultant / senior engineerTraffic analysis, specifications, tender reviews
- 4Lift contracts / service managerMaintenance portfolio, safety and modernisation
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Lift industry training (LEIA courses) | Lift and Escalator Industry Association (UK) | Early career |
| Certified Elevator Technician (CET) | National Association of Elevator Contractors (US) | Mid-career |
| Qualified Elevator Inspector (QEI) | NAESA International / QEI Certification | Senior |
| Chartered Engineer (CEng) | CIBSE or IMechE (Engineering Council) | Senior |
Interview questions
What do you look at in a lift traffic analysis?
Building population and peak demand, the number, speed and capacity of lifts, and the results: handling capacity (percentage of population moved in five minutes) and average waiting or interval times against the target for the building type.
What is special about a fire-fighting lift?
It is designed to EN 81-72 for use by fire fighters: protected shaft and lobby, secondary power supply, water protection for electrical parts, fire-fighter controls and a car size large enough for equipment and stretchers.
What tests are done before a lift is handed over?
Safety gear and overspeed governor tests, buffer tests, door and safety circuit checks, load and brake tests, emergency lowering and alarm, fire service and evacuation functions, then inspection by a competent third party.
Check each certifying body's website for current eligibility and exam requirements.