Site & delivery

Land Surveyor / Survey Engineer

Establishes survey control, sets out structures and roads, records as-built positions and levels, measures quantities, and manages survey data. Every project starts and ends with survey work.

Career path

  1. 1
    Assistant surveyorLevelling, staff and prism work, data entry
  2. 2
    Site surveyorSetting out, as-builts, volume surveys
  3. 3
    Senior / chief surveyorControl networks, survey method statements, QA
  4. 4
    Survey manager / geomatics leadSurvey strategy, GIS and BIM data, client interface

Core skills

Total station and GNSS RTKLevelling and closuresCoordinate systems and transformationsSetting out from drawingsAutoCAD Civil 3DUtility detection (CAT, GPR)Survey data management

Recommended certificates

CertificateIssued byWhen
Local licence or registration as surveyor (Qatar, Saudi Arabia, Egypt)National authorityEarly career
Manufacturer training (Leica, Trimble, Topcon)ManufacturerEarly career
Utility detection (PAS 128) trainingRecognised providerMid-career
RICS membership (MRICS)RICSSenior
Career tipBe the person who always checks. A surveyor's reputation is built on the one error caught before concrete, not the hundred points that were right.

Interview questions

How do you set out a building grid?

Check the control points and coordinates from the control report first, set up on control and check on a second known point, set out the grid intersections, then check them from another control point and by measuring distances between them against the drawing. Record everything in the setting-out log.

Your level run misses the closing benchmark by 18 mm over 2 km. What do you do?

Compare it with the allowable misclosure in the specification, for example 12 √2 ≈ 17 mm. It is outside, so I re-level the run after checking the bookings, the benchmark values and the two-peg test, rather than distributing the error.

What is a combined scale factor?

The factor that converts ground distances to grid distances: projection scale factor times the height (elevation) factor. Over long distances or high sites it must be applied when setting out from grid coordinates.