Utilities & infrastructure

Infrastructure / Utilities Coordination Engineer

Coordinates the wet and dry utilities, roads and structures of an infrastructure package: combined services drawings, crossings, authority approvals, testing and handover to each utility owner.

Career path

  1. 1
    Site / utilities engineerSupervises one network: trenching, laying, testing
  2. 2
    Senior infrastructure engineerSeveral networks and the road works for a section
  3. 3
    Utilities coordination managerCombined services, crossings and all authority approvals
  4. 4
    Infrastructure project managerThe whole package: programme, cost, client and authorities

Core skills

Reading road and utility drawings and profilesCombined services and clash checksAuthority requirements and approvalsTesting of pipes, cables and ductsSurvey data, levels and as-builtsTraffic management and permits to dig

Recommended certificates

CertificateIssued byWhen
Utility owner's contractor or engineer registration (where required)Local utility authoritiesEarly career
Confined spaces and excavation safety trainingAccredited training bodyEarly career
PMP or a project management certificatePMI or similarSenior
Career tipWalk the route with the combined services drawing before the first excavation. Most clashes can be seen on the ground in an hour, and each one found early saves days later.

Interview questions

Two services cross at the same level on site, not shown on the drawings. What do you do?

Stop at the crossing, trial-pit to confirm both, record it, raise an RFI with a sketch and the levels, and agree the solution with both owners before continuing.

How do you plan testing so the road works are not delayed?

Test by section in chainage order, book the owners' witnesses in the look-ahead and close the trench only after the test results are signed.

What do utility owners usually need at handover?

As-builts in their format with coordinates and levels, test and material certificates, a joint inspection with a closed defects list and their taking-over letter.

Check each certifying body's website for current eligibility and exam requirements.