Highway & Pavement Engineer

Designs and builds roads: alignment and levels, pavement layers, drainage and traffic safety, then supervises earthworks, asphalt and testing on site.

Career path

  1. 1
    Graduate highway engineerLevels, quantities, testing records, site supervision
  2. 2
    Highway / pavement engineerPavement and drainage design, method statements, QA/QC
  3. 3
    Senior highway engineerCorridor design, interfaces with utilities, traffic management
  4. 4
    Principal / roads directorMajor road programmes, design review, client advice

Core skills

Geometric designPavement design (AASHTO 1993 / ME)Earthworks and compaction controlAsphalt technologyStorm water drainageTraffic managementCivil 3D / OpenRoads

Recommended certificates

CertificateIssued byWhen
Local engineer registration (Qatar, Saudi Arabia, Egypt)National authorityEarly career
OSHA 30-Hour ConstructionOSHA (US)Early career
Road Safety Audit training (to the national scheme)Authority or approved providerMid-career
Chartered Engineer (CEng) via ICE or CIHTICE / CIHTMid-career
PE (Civil: Transportation)NCEES (US)Senior
Career tipLearn to read the test results as well as the drawings. A highway engineer who understands Proctor, CBR and core results catches problems before the next layer covers them.

Interview questions

What do you check before approving a subgrade layer?

Approved material and its Proctor and CBR results, soft spots removed and proof-rolled, layer thickness, moisture near OMC, field density tests passing at the right frequency, levels and cross-fall, and services below the layer tested and recorded.

A core fails density. What do you do?

Check the delivery temperatures and rolling records for that area, take more cores to define the extent, and agree the remedy with the consultant: accept with a reduction if the spec allows, or mill and replace.

How do you choose the length of a vertical curve?

From the design manual's minimum K value for the design speed: stopping sight distance for crests, headlight and comfort for sags, then check drainage at the low point.

Check each certifying body's website for current eligibility and exam requirements.