Facility Management / O&M Engineer
Keeps buildings and infrastructure running after handover: planned and reactive maintenance, energy, contractors and asset data, so systems stay safe, reliable and efficient for decades.
Career path
- 1O&M / maintenance engineerPlanned maintenance, work orders, contractor supervision
- 2Senior O&M engineerCritical systems, energy saving, maintenance planning
- 3Facility managerWhole-site operation, budgets, service contracts
- 4FM director / head of asset managementPortfolio strategy, lifecycle planning, ISO 41001 / 55001
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Facility Management Professional (FMP) | IFMA | Early career |
| IWFM Level 4 Certificate in Facilities Management | Institute of Workplace and Facilities Management | Mid-career |
| Certified Energy Manager (CEM) | Association of Energy Engineers (AEE) | Mid-career |
| Certified Facility Manager (CFM) | IFMA | Senior |
Interview questions
What do you check before accepting a building from the contractor?
Complete as-builts and O&M manuals, testing and commissioning records, an asset register with tags, warranties with correct start dates, spares and tools, training records and a closed snag list for critical systems.
How do you build a maintenance plan?
From the asset register: assign each asset a task list and frequency from the manufacturer and a recognised standard such as SFG20, adjust for criticality and local conditions such as heat and dust, and load it into the CMMS as recurring work orders.
How do you cut energy use in an operating building?
Measure first (sub-metering, BMS trends), fix schedules and set points, repair faulty valves and sensors, clean coils and filters, then consider upgrades such as VFDs, LED lighting and chiller plant optimisation.
Check each certifying body's website for current eligibility and exam requirements.