Commissioning & Data Centre Engineer

Plans and runs testing from pre-commissioning to integrated systems testing. Data centres, hospitals and airports rely on this role most.

Career path

  1. 1
    Testing & commissioning engineerPre-commissioning, functional tests
  2. 2
    Commissioning leadSystem commissioning plans, load bank testing
  3. 3
    Commissioning manager / CxAIntegrated systems testing and handover strategy

Core skills

Test proceduresProtection relay testingLoad bank testingIST scriptingBMS / EPMS

Recommended certificates

CertificateIssued byWhen
Certified Data Centre Professional (CDCP)EPIEarly career
NETA Certified Technician (Level III / IV)NETAMid-career
Certified Building Commissioning Professional (CBCP)AEEMid-career
Accredited Tier Designer (ATD)Uptime InstituteSenior
Certified Data Centre Specialist / Expert (CDCS / CDCE)EPISenior
Career tipHands-on IST experience on a live data centre is rare and highly valued. Record every test you lead, with system size and redundancy level.

Interview questions

What is the difference between SAT and IST?

SAT tests each system on its own on site. IST tests all systems working together under scenarios such as a utility power failure.

What do you check during a generator load bank test?

Voltage and frequency stability, transient response to load steps, temperatures, fuel consumption and protection operation, at loads up to 100 % rated.

How do you write a good test procedure?

Clear prerequisites, step-by-step actions, expected results and acceptance criteria, with space to record results and sign-offs.

Check each certifying body's website for current eligibility and exam requirements.