Civil / Structural Engineer
Designs or builds structures, roads, utilities and earthworks. Works from analysis and design through to site supervision.
Career path
- 1Graduate civil engineerCalculations, quantities, site supervision
- 2Civil / structural engineerElement design or site area responsibility
- 3Senior engineerFull structural systems, checking, authority submissions
- 4Principal / chief engineerTechnical authority and design sign-off
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Autodesk Certified Professional: Revit for Structural Design | Autodesk | Early career |
| Local engineer registration | National authority | Early career |
| Chartered Engineer (CEng) | ICE / IStructE | Mid-career |
| Professional Engineer (PE), Civil | NCEES (US) | Mid-career |
| Structural Engineer (SE) | NCEES (US) | Senior |
Interview questions
What checks do you do before a concrete pour?
Formwork and propping, reinforcement against drawings (bar sizes, spacing, cover, laps), embedded items from other trades, and approval of the pour request.
How do you deal with hot weather concreting?
Control the concrete temperature with chilled water or ice, pour at night, use retarders, protect from wind and start curing immediately.
What is cover and why does it matter?
The concrete thickness between the reinforcement and the surface. It protects steel from corrosion and fire. Too little cover leads to early durability failures.