CAD Draftsman / BIM Modeller
Prepares design, shop and as-built drawings and BIM models for a discipline (architecture, structure, MEP, infrastructure), following the project CAD and BIM standards.
Career path
- 1CAD draftsmanShop and as-built drawings from mark-ups, title blocks, registers
- 2Senior draftsman / BIM modellerCoordinated services drawings, Revit or similar models, sheet sets
- 3BIM coordinatorClash detection, model federation, project BIM standards
- 4BIM managerBIM execution plan, information delivery, team and tools
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Autodesk Certified Professional: AutoCAD | Autodesk | Early career |
| Autodesk Certified Professional: Revit (discipline track) | Autodesk | Mid-career |
| BIM coordinator or ISO 19650 course | Accredited training body | Senior |
Interview questions
How do you make sure you are drawing on the latest background?
I check the drawing register and the transmittal for the latest architectural revision, reload the xrefs and note the background revision in the title block or the notes.
Your plotted PDF shows all lines the same thickness. What do you check?
The plot style table attached in the page setup, that objects are ByLayer, and the layer line weights; then 'plot with plot styles' and line weights are switched on.
What goes into an as-built drawing that is not on the shop drawing?
Every change made on site: final routes and levels, approved RFIs and site instructions, real equipment tags, and buried services dimensioned from fixed points.
Check each certifying body's website for current eligibility and exam requirements.