BIM Coordinator / BIM Manager
Runs the project's information model: federates discipline models, leads clash detection, enforces naming and ISO 19650 processes, and makes sure models produce usable drawings and handover data.
Career path
- 1BIM modellerDiscipline modelling and drawing production
- 2BIM coordinatorFederated models, clash detection, coordination meetings
- 3BIM managerBIM execution plan, standards, CDE and team leadership
- 4Digital delivery / information managerCompany-wide standards, digital twins and asset data
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Autodesk Certified Professional: Revit | Autodesk | Early career |
| buildingSMART Professional Certification – Foundation | buildingSMART International | Early career |
| ISO 19650 training certificate | BSI (British Standards Institution) | Mid-career |
| PMP – Project Management Professional | PMI | Senior |
Interview questions
How do you prioritise clashes?
Group them by system and zone, ignore tolerated soft clashes agreed in the BEP, then fix in order of what is hardest to move: gravity drainage and large ducts first, then pipes, cable trays and small services, assigning each group to a responsible discipline with a date.
What is a BIM execution plan (BEP)?
The team's response to the client's information requirements: who models what, levels of information need, naming and file standards, CDE workflow, coordination schedule and deliverables, agreed before modelling starts.
What does ISO 19650 change on a project?
It sets a common way to specify, produce and exchange information: clear requirements from the client, a CDE with work-in-progress, shared, published and archived states, and checks before information is shared or issued.
Check each certifying body's website for current eligibility and exam requirements.