HA Engineering Hub · Learn • Calculate • Check
Scientists study the world as it is. Engineers create the world that has never been.
— Theodore von Kármán, aerospace engineer
Free engineering calculators, guides, checklists and Excel tools, built on international standards, with local guidance for Qatar, Saudi Arabia and Egypt.
Free · no sign-up for calculators · standards cited · results are preliminary, verify before design
What are you trying to do?
Featured calculators
All calculators →Calculations
Ready calculators for every discipline
Engineering Topics
Standards, safety cards and lessons from failures
What's new
More resources
Electrical Center
Calculators, guides, checklists and exams for electrical and ELV engineers
Engineering Library
Codes, books, free resources and software
Careers & Certificates
Career paths, certificates and interview prep
Templates
Submittals, RFIs, method statements and reports
Glossary EN ↔ AR
Engineering terms in English and Arabic
Exam Corner
Practice quizzes for PMP, NEBOSH, LEED and more
Jobs Board
Engineering vacancies shared by members
Engineers Chat
Ask and share know-how by discipline
Engineering calculators
Electrical, mechanical, civil, plumbing, renewables and project controls. Every calculator opens with typical values filled in.
Electrical Center: calculators in design orderAbout these calculators
Each calculator shows the formula, the standards it follows (IEC, BS 7671, NFPA, ASHRAE, ACI and others), the assumptions behind the result, and a worked example with the default values. Results update as you type, and you can print a one-page calculation sheet for your file.
They are made for quick checks on site and early design in Qatar, Saudi Arabia, Egypt and the wider Gulf. Results are preliminary: confirm them with the project specification, the local authority rules and the manufacturer's data before final design.
الفرشة والردم للخندق لكل متر
الحفر والفرشة الحبيبية والتغليف والردم لخندق مواسير
خندق بجوانب رأسية. الخنادق ذات الميول أو المدعّمة والحفر الزائد للمناطق الضعيفة والتغليف بالرمل أو الأسمنت تحتاج كمياتها الخاصة. فئة الفرشة وتدرج المواد وسماكة الطبقات والدمك تتبع معيار الماسورة ومواصفة المشروع.
ما يجب التحقق منه قبل التصميم ↓تحقق قبل الاستخدام في التصميم
- عرض الخندق وفئة الفرشة والدمك مقابل المواصفة ومعيار الماسورة.
- التدعيم أو الميول للخنادق الأعمق من 1.2 م (تصريح وتصميم أعمال مؤقتة).
- راجع إصدار كل معيار تطلبه مواصفات مشروعك.
- أكد النتائج ببيانات المصنّع والتصميم المعتمد قبل التنفيذ.
الأساس وطريقة الحسابالإصدار 1.0 · نوفمبر 2026آخر مراجعة للأساس: نوفمبر 2026✓ مختبرة على أمثلة محلولة✓ راجعها مهندس أول · نوفمبر 2026
المعادلة
المعايير والمراجع
- EN 1610 (construction and testing of drains and sewers)
- Pipe maker's installation guide (bedding class)
- Project specification (granular grading, compaction)
الافتراضات
- خندق بجوانب رأسية بعرض ثابت؛ فرشة وتغليف حبيبي بالسماكة المذكورة؛ الأحجام مدموكة ما لم يُذكر غير ذلك.
المدخلات والوحدات
| القطر الخارجي للماسورة | mm | 50–2000 |
| عرض الخندق عند الماسورة | m | 0.3–3 |
| عمق الخندق (من الأرض إلى قاع الخندق) | m | 0.5–6 |
| الفرشة أسفل الماسورة | mm | 100–300 |
| التغليف الحبيبي فوق قمة الماسورة | mm | 100–400 |
| طول الخندق | m | 1–2000 |
| معامل التحويل من سائب إلى مدموك للمواد الحبيبية الموردة | 1–1.4 |
المدى المعتاد: العمود الأخير
مثال محلول (القيم الافتراضية)
- القطر الخارجي للماسورة315 mm
- عرض الخندق عند الماسورة0.95 m
- عمق الخندق (من الأرض إلى قاع الخندق)1.5 m
- الفرشة أسفل الماسورة150 mm
- التغليف الحبيبي فوق قمة الماسورة300 mm
- طول الخندق100 m
- معامل التحويل من سائب إلى مدموك للمواد الحبيبية الموردة1.25
وجدت خطأ؟ أبلغنا
Things you should know
Short, practical notes on standards, site safety, contracts and lessons from famous failures.
Build your engineering career
Pick a career path to see how it progresses, the skills and certificates it needs, and typical interview questions.
A shelf for every engineer
Key standards, recommended books, free online resources and the software each discipline uses.
Practice before the real exam
Short practice quizzes with instant scoring and explanations.
Ready formats for daily site work
Open a template, copy it, and paste it into Word, Excel or an email.
Excel sheets for site and design work
Each workbook has a blank sheet, a completed SAMPLE and a How-to-use tab. Fields marked project-defined follow your contract.
Document outlines
Engineering terms in English and Arabic
Search in either language. Useful for bilingual site teams and reports.
Engineering vacancies
Vacancies shared by members and recent postings from external job sites. Links open the original posting. Always verify the employer, and never pay to apply.
Site checklists
Tick items as you go. Your progress is saved in this browser.
Electrical Center
Everything on the site for electrical and ELV engineers in one place: calculators in the order you design, site guides, checklists, practice exams, careers and the standards to keep at hand.
Quick reference
The tables engineers look up every day, in one place.
Common drawing symbols
Typical symbols with their names in English and Arabic. Always check the legend on your project drawings.
Engineering news and events
Recent project and industry headlines, and the major exhibitions coming up. Updated weekly.
Latest news
Upcoming events
Dates come from organiser and listing sites. Confirm on the official website before booking travel.
Ask a technical question
Get an instant answer on electrical, mechanical, civil, plumbing, contracts, safety or careers. Ask in English or Arabic.
Answers are generated by AI and are not reviewed by an engineer. Each answer lists its sources and what to verify. Use it to learn and to prepare questions, not as a design approval.
Ask, answer, share
Pick a channel for your discipline. Be specific: state the standard, voltage, load or location you are working with.
Answers here come from members and are not reviewed. Check them against the standard, the project specification and a qualified engineer before using them.