HA Engineering Hub · Learn • Calculate • Check
Scientists study the world as it is. Engineers create the world that has never been.
— Theodore von Kármán, aerospace engineer
Free engineering calculators, guides, checklists and Excel tools, built on international standards, with local guidance for Qatar, Saudi Arabia and Egypt.
Free · no sign-up for calculators · standards cited · results are preliminary, verify before design
What are you trying to do?
Featured calculators
All calculators →Calculations
Ready calculators for every discipline
Engineering Topics
Standards, safety cards and lessons from failures
What's new
More resources
Electrical Center
Calculators, guides, checklists and exams for electrical and ELV engineers
Engineering Library
Codes, books, free resources and software
Careers & Certificates
Career paths, certificates and interview prep
Templates
Submittals, RFIs, method statements and reports
Glossary EN ↔ AR
Engineering terms in English and Arabic
Exam Corner
Practice quizzes for PMP, NEBOSH, LEED and more
Jobs Board
Engineering vacancies shared by members
Engineers Chat
Ask and share know-how by discipline
Engineering calculators
Electrical, mechanical, civil, plumbing, renewables and project controls. Every calculator opens with typical values filled in.
Electrical Center: calculators in design orderAbout these calculators
Each calculator shows the formula, the standards it follows (IEC, BS 7671, NFPA, ASHRAE, ACI and others), the assumptions behind the result, and a worked example with the default values. Results update as you type, and you can print a one-page calculation sheet for your file.
They are made for quick checks on site and early design in Qatar, Saudi Arabia, Egypt and the wider Gulf. Results are preliminary: confirm them with the project specification, the local authority rules and the manufacturer's data before final design.
تباعد أعمدة إنارة الطرق
تباعد الأعمدة لتحقيق متوسط شدة إضاءة مطلوب على الطريق
تحجيم أولي بطريقة اللومن لفئات الاستضاءة (لوكس). الترتيب من جانب واحد والترتيب المتعاكس المتبادل يحسبان وحدة إنارة واحدة لكل مسافة عبر الطريق، فيعطيان نفس المسافة؛ والترتيب المتقابل يحسب وحدتين. طرق المرور المصممة بالنصوع (فئات M في EN 13201) والانتظام والإبهار (TI) ونسبة المحيط تحتاج برنامج تصميم إنارة بملف القياس الضوئي للوحدة. فئة الإنارة تحددها جهة الطرق.
ما يجب التحقق منه قبل التصميم ↓تحقق قبل الاستخدام في التصميم
- فئة الإضاءة والانتظامية والوهج ونسبة المحيط ببرنامج تصميم إضاءة بملف القياس الضوئي.
- مواقع الأعمدة بالنسبة للتقاطعات والمنحنيات والمداخل والخدمات المدفونة.
- راجع إصدار كل معيار تطلبه مواصفات مشروعك.
- أكد النتائج ببيانات المصنّع والتصميم المعتمد قبل التنفيذ.
الأساس وطريقة الحسابالإصدار 1.1 · نوفمبر 2026آخر مراجعة للأساس: نوفمبر 2026✓ مختبرة على أمثلة محلولة✓ راجعها مهندس أول · نوفمبر 2026
المعادلة
المعايير والمراجع
- EN 13201-2 (road lighting: performance requirements)
- CIE 115 (lighting of roads for motor and pedestrian traffic)
- Road authority lighting standard
الافتراضات
- طريقة اللومن: متوسط شدة الإضاءة على عرض الطريق؛ نوع واحد من الكشافات بتباعد واحد.
المدخلات والوحدات
| الفيض الضوئي للكشاف | lm | 1000–40000 |
| عرض الطريق المضاء | m | 3–30 |
| متوسط شدة الإضاءة المطلوب | lux | 5–50 |
| معامل الاستفادة | 0.2–0.7 | |
| معامل الصيانة | 0.6–0.95 | |
| ارتفاع التركيب | m | 4–15 |
| طول الطريق | m | 50–10000 |
| الترتيب | — |
المدى المعتاد: العمود الأخير
مثال محلول (القيم الافتراضية)
- الفيض الضوئي للكشاف12000 lm
- عرض الطريق المضاء7.3 m
- متوسط شدة الإضاءة المطلوب15 lux
- معامل الاستفادة0.4
- معامل الصيانة0.8
- ارتفاع التركيب10 m
- طول الطريق1000 m
- الترتيبمن جانب واحد
وجدت خطأ؟ أبلغنا
Things you should know
Short, practical notes on standards, site safety, contracts and lessons from famous failures.
Build your engineering career
Pick a career path to see how it progresses, the skills and certificates it needs, and typical interview questions.
A shelf for every engineer
Key standards, recommended books, free online resources and the software each discipline uses.
Practice before the real exam
Short practice quizzes with instant scoring and explanations.
Ready formats for daily site work
Open a template, copy it, and paste it into Word, Excel or an email.
Excel sheets for site and design work
Each workbook has a blank sheet, a completed SAMPLE and a How-to-use tab. Fields marked project-defined follow your contract.
Document outlines
Engineering terms in English and Arabic
Search in either language. Useful for bilingual site teams and reports.
Engineering vacancies
Vacancies shared by members and recent postings from external job sites. Links open the original posting. Always verify the employer, and never pay to apply.
Site checklists
Tick items as you go. Your progress is saved in this browser.
Electrical Center
Everything on the site for electrical and ELV engineers in one place: calculators in the order you design, site guides, checklists, practice exams, careers and the standards to keep at hand.
Quick reference
The tables engineers look up every day, in one place.
Common drawing symbols
Typical symbols with their names in English and Arabic. Always check the legend on your project drawings.
Engineering news and events
Recent project and industry headlines, and the major exhibitions coming up. Updated weekly.
Latest news
Upcoming events
Dates come from organiser and listing sites. Confirm on the official website before booking travel.
Ask a technical question
Get an instant answer on electrical, mechanical, civil, plumbing, contracts, safety or careers. Ask in English or Arabic.
Answers are generated by AI and are not reviewed by an engineer. Each answer lists its sources and what to verify. Use it to learn and to prepare questions, not as a design approval.
Ask, answer, share
Pick a channel for your discipline. Be specific: state the standard, voltage, load or location you are working with.
Answers here come from members and are not reviewed. Check them against the standard, the project specification and a qualified engineer before using them.